OCR Text |
Show 731,481. The central division absorbed absorb-ed $60,807,775, tho greatest Hem being be-ing over $58,000,000. on excavation, probably accounted for by the tremendous tre-mendous cut at Culebra. In the Pacific division $3317.183 of United States money went for excavation, ex-cavation, foundations, masonry and the like. MIraflores dams and spillway have cost ,$355,S68; locks at the " same point, $2,239,257; Laboca locks and dams. $e32.9fl! and altogether $103,-005,10ft $103,-005,10ft has been spent on construe tlou and engineering excluding charges for sanitation, hospital and civil government Work of constructing the hrirhr entrances Is holding attention. The dredges at work In the Atlantic entrance en-trance last month removed 4H.77S cubic cu-bic yards of material or more than has been taken out In any month except ex-cept December, 190S. FIGURES ON COST OF PANAMA CANAL j Washington, Nov. IS With the I completion cf the Panama caual w ithin ith-in the range of vision. Interest attaches at-taches to a formidable array of flg-' flg-' ures In the Jos' Issue of the Canal Record. Indicating the cost to date and extent of the various branches I of the gicat work. Up to Sept. 30, last, there has bean expended on tho Atlantic division $25,- |