OCR Text |
Show NOTICE TO WATER USEB3 Notice Is hereby given that I he Board of Wat.r Rpsourcos, 135 State Capitol, Salt Lake City, Utah 81111, has filed a request for extension of time from thp State Engineer to make and submit proof nf appropriation ap-propriation for Appl. No. 1951W (711179) covering (WX) ac.-ft. of water from Pinto Creek In Iron County, Utah, for Irrigation Irriga-tion purposes. It Is represented that construction con-struction of the dam and side channel spillway has heen completed at a Post of $313, 817.21. It Is planned to raise the dam 1.7 ft. and the spillway spill-way flowlino 3 ft. to facilitate facili-tate the storage of an additional addi-tional ,r0() ac.-ft. at a cost of $10,000. Additional time is necessary to complete the pro-i pro-i Jpct and make and submit proof of appropriation. Protests resisting the granting grant-ing of this request with reasons rea-sons therefor must be filed In duplicate with the Statp Engineer, En-gineer, 412 State Capitol, Salt Lake City, Utah 84114, on or before Apr. 19, 1909. A hearing will bp held on this requpst before the State Engineer at 10:00 a. m., Thurs., Apr. 21, 19G9, in the County Courthouse, Parowan, Utah. Protestants should appear at the hearing. Hubert C. Lambert, State Engineer Published in Iron Co. Record, Cedar City, Utah, Mar. 6, 13, 20, 19G9. |