OCR Text |
Show ADVTSTEEMENT FOR BIDS Ashley Valley Reservoir Corrpany, 61 East Main Street, Vernal, Utah 84078. Separate sealed BIDS for the construction of Oaks Park Canal, Phase LT including in-cluding the construction of approximately 2220 feet of 36 inch pipe line, 540 feet of 42 inch pipe line, measurement, and other concrete structures will be received by Ashley Valley Reservoir Corrpany at their office of 61 East Main Street until 2 p.m. (Daylight Savings Time ) July 9 , 1 9 8 1 , and then at said office publicly opened and read aloud. The CONTRACT IXXXTvENTS may be examined ex-amined from 10 a.m. to 3 p.m. at the following locations: loca-tions: Valley Engineering, Inc. 1345 W. ffighway 40, Vernal, UT 84078; Inter-mountain Inter-mountain Contractor 444 South 300 West, Salt Lake City; Valley Engineering. In-c. In-c. 5184 Wiley Post Way, Salt Lake City 84116. Copies of the CONTRACT DOCUMENTS may be obtained ob-tained at the office of Valley Engineering. Inc. located at 1345 W. Highway 40, Vernal, Ver-nal, UT upon payment of $50 .00 for each set. Each bidder mist subnit a bid bond from an approved approv-ed surety Corrpany on forms provided by the Engineer, or in beu thereof, certified check or cashier's check for not less than 5 - percent of the total amount of the bid, made payable to the Ashley Valley Reservoir Corrpany as evidence of good Laiih and a guarantee that if awarded the coo-tract, coo-tract, the bidder wJl execute ex-ecute the contract and furnish fur-nish the required contract bonds Trie rht to reject any or all bids b reserved July 2. 1981. A D Jenkins. President Publched m the Vernal Express June 25. and July 2. 1981 . |