OCR Text |
Show KING DAVID, INDIAN QUEEN WORK PROGRESSES David Evnns. general manager of the King David and Indian Queen companies, compa-nies, left last night for his homo in California. To The Tribune. Mr. Evans said yesterday that the King David management was still developing on tho 200 and 300 levels, gottlng some ore at both points, while the drift on the 800-foot 800-foot level was making for the territory where ore should make. The Indian Queen tunnel, now In 4700 feet. Is In the ore-making country, and results arc due at any time. Numerous Assures aro being be-ing cut as this tunnel work proceeds. The objective point is the contact between be-tween Ihe qunruito and the lime, which is estimated lo be 300 feet ahead of the present face. |