Show I Extending the Canal System j i Extnding te Cana i Box Elder News I is reported that I the Bear River Canal company have I under consideration the matter of running run-ning a lateral from the main canal at a j I point near the Toltec ranch on section 4 township 1 north range 3 west and running from there In a southerly direction rection between the Malad river and Salt creek to the Salt lake at a point west of Corinne ThIs will add about 10000 acres to the land susceptible or irrigation from the canal system of this I company and will also give employment i I employ-ment to many during its construction I |