Show the location Eugine engineers ers are now at work making the final survey of the route of the federal aid highway down peters hill so it should be possible to have the contract let for the construction of the road as early in the spring as the frost lea leaves ves the gound with wat that done and the road to the sta state e ii line ne graveled san juan countes coun tys main arteries of trade will be pretty well complete with the exception of an outlet to the south such an outlet can only be secured by having a connecting state road to Av arizona izona this will have to be designated designated by the legislature so we must see to it that it be d done le this winter when it is done we can work with Arizona to get a iassc passable ible road |