OCR Text |
Show OIL NEWS Crews at Carter Oil Co.'s Bluebell Unit No. 1 well, located lo-cated in Sec. 6-1S.2W, cored at 11,334-48 ft, recovering 14 ft. of fluid. A drill stem test at 11,230-448 ft, open 30 minutes, produced a faint initial blow and died. 100 ft. of drilling mud was recovered with no oil shows. A core at 11,348-400 ft. recovered re-covered 52 feet of fluid. A drill stem test at 11,350-400 ft., open an hour, produced a fair blow initially and died at the end of the test, recovering 300 ft. of drilling fluid. Totol well depth is 11,448 ft. Crews are pulling core at 11,-400-48 ft. Carter's Ute Tribal No. 1 well at Duchesne, located in Sec. 17, T4S., R4W., is now down 928 ft. Crews are reaming with a HVz in. reamer at 312 feet. |