Show COREY BROS GET CONTRACT FOR SYSTEM gravity pipe line twenty eight miles in length will be started upon at once from fridays standard A contract haa been awarded corey bros construction company by the southern pacific company for the building 0 a gravity pipe hue at lamay on the lucin cutola work upon the line which will be twenty eight miles in length will be started at once the water ie taken from a spring just above terrace and crosses the flats new line of the road the work will be done as on pipe lines at montello and pocatello iy ay the patented ditcher which will bo shipped from pocatello immediately two carloads of outfit wre shipped to lemay last evening the specifications califor the building of a reser tir near the spring and a line 0 ten aach pipe to be laid to he railroad the problem of fresh water upon the cutoff which has been the source ot much trouble now seems to ba solved and the residents of lemay now have a water similar to those of montello and pocatello and not have to depend upon their supply from the water cars |