OCR Text |
Show NOTICE TO CONTRACTORS , Sealed proposals will be received re-ceived by the State Road Commission Com-mission of Utah, Room G08, State Office Building, Salt Lake City, Utah, until 2 o'clock p. m. Tuesday, Tues-day, September 6, 1906, and at that time publicly opened for construction of Erosion Control in Iron County, the same being that section of Interstate Highway High-way No. 15 from Hamilton Fort to Cedar City identified as Federal Fed-eral Aid rroject No. 1-15-2(14)52 2nd Contract. The length of road to be constructed con-structed or improved is 5.46 miles, and the principal items of work are approximately as follows: 155 Acres of Grass Seeding Method A and 18 Acres of Mulching Mulch-ing - Type A or B. The project is to be completed in 40 working days. Prequalification of bidders is required. Prior to any bidder's receiving plans and specifications, specifica-tions, it will be necessary that the bidder have on file with the State Road Commission of Utah completed and approved, the required re-quired Prequalification Statement State-ment pertaining to contractor's experience and financial condition. condi-tion. The attention of the bidders is directed to the Special Provisions covering subletting or assigning the contract. In conformity with Section 115 of the Federal Aid Highway Act of 1956 the U. S. Department of Labor has certified the wage rates for this project which are the minimum wages to be paid on this project. These rates are made a part of the contract documents. doc-uments. The attention of bidders is directed di-rected to the fact that this Commission Com-mission has been advised by the Wage and Hour Division, U.S. Department of Labor, that contractors con-tractors engaged in highway construction con-struction work are required to meet the provisions of the Fair meet the provisions of the Fair Labor Standards Act of 1938, (52 Stat. 1060). The State Highway Department, Depart-ment, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252) and the regulations of the Department De-partment of Commerce (15 C.F. R., Part 8), issued pursuant to such Act, hereby notifies all bidders bid-ders that it will affirmatively insure in-sure that the contract entered into pursuant to this advertisement advertise-ment will be awarded to the lowest low-est responsible bidder without discrimination on the ground of race, color, or nation origin. Proposal forms, plans, cross sections sec-tions and specifications are on file in the office of the State Road Commission, Salt Lake City, and the office of the District Engineer Engi-neer at Cedar City, Utah where they may be reviewed by prospective pros-pective bidders. Specifications, proposal forms, and plans may be obtained at the Commission Offices at Salt Lake City, upon application and payment of a fee of $5.00, no part of which will be refunded. Each bidder must submit a letter from an approved surety company guaranteeing to furnish said bidder with required bond. The right to reject any or all bids is reserved. Cash, certified check, cashier's check, or approved proposal guarantee bond for not less than five percent of total amount of bid made payable to the State Road Commission must accompany accom-pany each bid as evidence of good faith and a guarantee that if awarded the contract, the bidder bid-der will execute the contract and furnish contract bond as required. Any additional Information may be secured at the office of the State Road Commission. Dated this 13th day of August, 1966. State Road Commission of Utah Henry C. Hellcmd, Director of Highways (Aug. 18, 1966). |