| Show Engineer Pleased With Cutoff Work H. H S S. S Kerr chief state highway engineer en cn was back in his office Thursday Thursday Thursday Thurs Thurs- day well satisfied with the progress and quality o of work on the thc Wendover cutoff road This highway carries the thc joint designations of highways 40 and 50 to the west state line Two pieces of the road totaling 23 miles are being built bum up now One is the 10 miles from the thc west line of the state slate of Utah to the cast east and the thc other is 13 miles between Temple Tempie and md Noble Accompanying Mr Kerr on the thc trip were S S. D. D Cate Calc state slate district engineer engineer engineer en en- F F. F W W. Smith highway engineer for or the thc federal bureau o of public roads and E. E C C. Knowlton assistant engineer engineer engi neer to the thc state road commission |