OCR Text |
Show PLATE MILL AT GENEVA TO CLOSE TWO WEEKS The plate mill division of the Geneva Steel plant will shut down soon for approximately a 2 week period while the roll stands for the new strip mill are installed, it was learned today. The shut down is expected to begin about the middle of the current month. Officials said that paid vacation periods would be scheduled in so far as possible to coincide with the shut down for workers affected. It was believed a large number could be taken care of in this manner. For those who have already had their vacations, |