OCR Text |
Show NOW GETTING BUSY ON NEW WATER SYSTEM Speciftl to The Tribune. OGDEN, Sept. 20. By September 27 trie plans and specif ications for the new conduit to be built from Coldwator canyon can-yon to the new city reservoir, will bo completed, according to Assistant City engineer Roach. On that day tho city will advertise for bids for the construction construc-tion of the pipe line, which will run through Ogden canyon for one mile, necessitating ne-cessitating the construction of several short tunnels through solid mountains of rock to lay the pipe. The preliminary prelimi-nary survey has already been completed i , engineer office Is In possession posses-sion of the plat showing the route which will be taken by the conduit. It Is the Intention of tho city to have most of the construction work started before freezing weather begins, and to complete the conduit by early spring, so the swollen waters of the Coldwater canyon at that season may be conserved and piped to the big reservoir. Tho other conduit which will bo laid from the reservoir to the distributive system In the city will not bo built until un-til noxt Bpring. |