Show BRANCH TO COAL MINES Rio Grande Surveyors Run a Line From Sunnyside Special Correspondence Price Utah June Assistant Chief Engineer Baxter anti a corps of surveyors sur-veyors have completed running the line for the branch road of the Rio Grande Western from Sunnyside station sta-tion to the new coal mines located in Whitmore canyon forty miles east of Price and have returned to Springvllle where supposedly the work and details particularly will be gone over by Chief Engineer Yard It was at first proposed pro-posed to run the line from Mounds station several miles to the west but a better route was found and it is said now the road will tap the main line I two miles this side or west of Sunnv side sideFrom From a party who was with the surveying outfit it is learned the grade Is an easy one all the way following a draw or valley almost the entire distance dis-tance and but one bridge in the entire sixteen miles to be built Another advantage ad-vantage of the Sunnyside line over the I Mounds station one is plenty of water for train use which is pumped and of good quality for engines being free from alkali The impression is still strong here that the road will be built and coal hauled out of the new camp by the 1st of October |