OCR Text |
Show ! VIADUCT RECEIVES FEW MB REPAIRS . J The viaduct spanning the railroad t- tracks on Twenty-fourth street I3 un-dergoing un-dergoing a few minor repairs. The stairs of the second landing are being be-ing repaired, the bottom tier being concreted. con-creted. Repairs also to the rail and the platform at the top of the stairs are being made. At the entrance of the viaduct near Wall avenue braces are being tightened tight-ened and a few timbers replaced. A I small force of workmen is handling I the Job. A short switching track is 'being added to the main tracks near the yard office. It is about 200 feet 'in length. |