Show SANTA FE FLOOD LOSSES topeka kan sept 21 in an interview today J E hurley general manager of the atchison to peka and santa fc rall roid states the company has lost over as a result of tho floods of the past week in eastern kansas nearly all of the loss was on the benedict branch and the emporia cutoff and includes eight bridges and 12 miles of track on the former branch general manager hurley said that work on the proposed santa fe line from san angeles texas to new mexico would not be started for at least a ear this is the line which Is to be the connecting link on a through transcontinental line from gal veston to the pacific coast it has been generally understood until today that the construction work would be started this tall |