OCR Text |
Show -oo EHR HERE I Uli U La ft Iii I'D. Local Manager S T. Wbitaker of the Ttuli Lteht and Railway company, stales that Engineer L. L. Dagron is In the city (or the purpose of mak-lug mak-lug a complete examination of the work that is being done at the company com-pany s power dam in Ogden canyon. The company has in mind the rapid rap-id completion of the work of racing the power dam. preliminary to which Is th changing of the grade of the county road ft Is expected that the englneor will Insist that the rade work be accomplished ac-complished at an earlier date than at present contemplated so that tha ork of laying concrete may begin without delay. The raising of the dam will not be accomplished until the low water period in the river, except that cement ce-ment required to bo placed at points on either side of the riverbed may. be laid at an earlier period. Mr. Dagron Dag-ron vrill return to tho state capital this evening, after his trip to the canyon. |