OCR Text |
Show BEDROCK AT THE DAM- SITE Engineer Bostaph states that bedrock bed-rock has been encountered across the (i-ntlre length of the Cobble Creek dam site and that O'Neill construction compnny is making rapid progre33, two-thirds of the work having been done. Bedrock Is found, the engineer says, at depths varying from two Inches "to sixteen feot and that it is as firm as ibedrock can be. The work of strioping the foundation founda-tion so far has consisted of removing nothing more than common earth and boulders The derricks have not been called Into use, the material all being be-ing easily handled by teams and scrapers. oo |