| OCR Text |
Show CHANGES IN THE WATER SYSTEM "If anybody goes dry in the city some of these days", says Superintendent Superin-tendent Kircher of the waterworks system, "you can tell jthem we are fixing tho system in certain places. The Twenly-thlrd streeU main has been completed to the reservoir that is now being concreted, and It becomes be-comes noce8sary for us to connect with it the znatnS tnmnlng nortn and south. WTien this 'Is done, the water In the main v.q are connecting has to be turned off a short time Mr. Kircher states that Quincy and Jefferson nienue mains have been connected with the Twenty-third street main, the Ifiam on Quincy avenue av-enue iboing 12 Inches -in diameter and the one on Jefferson 1G Inches In size. The connection ylth.the new reservoir reser-voir cannot 'bo made 'until the concrete con-crete work1 Is completed. Other connections con-nections between Washington and Harrison avenues on Twenty third street, will be made at the oarllest possible time and with the least possible pos-sible inconvenience to the people. , |