OCR Text |
Show Siiii W8 ON STREET LIGHT SYSTEM Contract Awarded to Wm. Frisby at SneeisJ Meet of I Council Held Last Saturday; Satur-day; Price Is $2334.20 The contract fcr furnishing material ma-terial and installing the street , lighting system was awarded to W;m. Frisby of Provo at a speckiX ! iiieetirg of the city council last Saturday. The total price is $2534.20, which includes all mr.te- rial and labor costs, but to which j will be added engineering costs, , advertising, and incidentals, which-j which-j will probably bring the total cost to the city close to $2900. A total frontage of 3324 feet will be-chargeaKe be-chargeaKe agoii.; the improve-; improve-; ment. bringing the cost to the property owner to approximately SO cents per front foot. By the terms of the oontnvct signed by Mr. Frisby, he must have-had have-had the material ordered by May 12 and complete the job within 30-ciays 30-ciays after the material is received-here. received-here. Twenty 13'.i foot metal standards stand-ards will be erected as follows: Both sides cf First North street from First East to Main, three-lights three-lights on each side; south on both sides of Main to Tabernacle, thence on west side of Main three lights on school block; four lights will be installed on the south side of the Tabernacle street business, block, and anotlicr will be Installed In-stalled just east of the Snow Furniture Fur-niture Co. Representatives of the Graybitf Electric Company, the Inte Mountain Electric Co., and the-General the-General Electric Co., in addition to the successful bidder, attended the meeting, all having submitteA figures for the job. |