OCR Text |
Show CITY CONSIDERS ; SEWERJFFERS Consensus that South Salt Lake's cash offers to Salt Lake City for connecting the former's sanitary sewer to Salt Lake City's eewage disposal system are Inadequate had resulted Tuesday In city officials offi-cials directing a study of the offer to form the basis of a counter offer. South Salt Lake's offer to pay 13000 annual rental and a 15000 connection fee. with a 15000 "faithful "faith-ful performance" cash surrender bond, was considered at a conference confer-ence of city officials late Monday. The offer also stipulated construction construc-tion of a 21-Inch trunk sewer from 2100 South and. 200 West streets to Thirteenth South and Third West streets, where it would be connected with the city's 60-Inch 60-Inch trunk sewer at the expense of South Salt Lake. The proposal was made aa an alternate for plana of South Salt Lake to construct a sewage disposal dis-posal plant at 2100 South and 200 West streets. The latter plan, according to Robert R. Fltts, chairman of the town- trustees, has never been abandoned, although work on It has a.n held la absyanea sines May. In the Interval Clyde C Kennedy, San Francisco sanitary engineer. Investigated and reported report-ed the disposal plant at the proposed pro-posed location Is not feasible. South Salt Lake's alternate plan has been referred by city commissioners commis-sioners to City Engineer W. D. Beers and City Attorney Fisher Harris for study and preparation of a counter proposal. |