OCR Text |
Show 1TICSTI0I1T0 IISTKE F 1 Will Deliver 2500 Feet of Air to Lower Workings Per Minute. Capable of delivering 2500 feet of fresh ; air per minute to the lower workings, preparations are being made at the Tin-tic Tin-tic Standard property, located In the Tin-tic Tin-tic district, to, Install a huge fan. Aa soon as the work. Is completed and the tan Is delivering the air to the lower workings, it is the opinion of the management manage-ment that the output of ore can be largely large-ly increased. The power lino being put In to the property is expected to be completed com-pleted by the end of this week. A much larger compressor is also to be Installed at the property as soon as the power line is in. All of the holes have been dug for the poles, which are being placed, and the power company will begin be-gin stringing the wire within the next few days. The transformers, capable of delivering approximately 400 horsepower, have been hauled to the property and the new compressor Is on the way. The new shaft is now diwn beyond the seventy-five foot point and has entered a brecciated material similar In strike and dip to that in which the ore occurs on the lower levels. It shows considerable considera-ble mineralization. As soon, as the new compressor is installed the shaft will be driven down as rapidly as possible to the ore bodies that have been developed on the lower levels. The new shaft will make possible the handling of the ore in a much more economical manner, besides improving the ventilation. The management manage-ment is confident that enough ore can be shipped to pay for the sinking of the new shaft. There has been developed on the 1600-foot 1600-foot level of the property a large ore body. On the 1500-foot level the ore body has been drifted on for a distance of more than 1 HO feet, with all of the faces of the drifts in ore. |