Show Work on Snort Line Depot. The foundation of Ihc new Oregon Short Line depot was completed Tuesday morning and Ihc work of erecting the I slone and brick work will begin immcvll- j ately and pushed with all possible speed. It Is stated by an official of the company j that tho depot will he completed in about one year from the present date. There are at present about 300 men at work on the building. Gravel Is being unloaded unload-ed on tho east side of the depot to bring the level up to tho street grade. Tuesday the plies for the outer slops leading from the depot to the tracks wore driven and mado ready for tho concrete. |