Show I fiNISH EXCAVATION AT KORNS BIG WAREHOUSE Structure Must Bo Be Completed Within 90 Days According to Terms of or the Contract l have havo been boen finished and active work on the erection of at tho the new warehouse of ot the horns Korns Warehouse company will begin Tuesday to be completed in 90 60 days under contract The warehouse will be one story high of concrete and brick briel construction and will cost about It will bill one of ot the largest larg In the tho city oitT having a n frontage of ot feet reel and depth of at 80 feet eeL A spur track tra It of ot the Denver Rio Grande company will 1111 be run the entire length of Jr the tho storage house on one aide and on the other will be a aright aright aright right of ot way for tor teams The new warehouse will really be bea bea bea a system of f eight separate rooms for tor storage purposes Largo shippers of ot machinery and other freight want their materials stored In separate rooms and for tor this purpose the building will be divided Into smaller rooms for tor the storage required by b these firms The now new warehouse will be on Fifth West street between Second and Third South streets situated between the tho Rio Grande Lumber company com and the Bam Bamberger berger Coal COlli company yards It will willbo willbe be bo half a block from tram the tho Rio Grande freight depot and a block and a half har ha from tram the freight depots of o the tho other lines JInes entering Salt Lake this being an Important Item in the warehouse business A now warehouse is also being erect erected erected ed cd by the Redman Van Storage com company company company pany on Fourth Wo West t street between First South and Second South streets which will wUl be four stories high with basement and will cover by no feet teet It will cost In the neighborhood of or when completed which will willbo willbe willbe be bo within the next six weeks |