OCR Text |
Show Notice To Water Users Notice is hereby given that the Dry Gulch Irrigation Company, Com-pany, by L, M. Ang'us, Roosevelt, Utah, has filed with the State Engineer a request foy an extension exten-sion pf time from ApriJ 14, 1950 to April 14, 1952, in which to make and submit proof of appropriation of water under Application No. 8330 for the appropriation of 1000 ac.-ft. of water from Uintah River, tributary trib-utary to Duchesne River in Uintah Uin-tah County, to be stored in Mon-tez Mon-tez Reservoir and used as a supplemental supply to irrigate 5680 acres of land. It is represented that an impounding im-pounding dam, outlet works and distribution system h a v e aH been completed at a cost Qf $100,000,00, and it is estimated it will cost $l,gog.OO to install measuring devices, and time is requested to make the necessary neces-sary installations and prepare proof of appropriation- All protests resisting the granting of said request, with reasons therefor, must be made in affidavit form with extra copy and filed with the State Engineer, 403 State Capitol, Salt Lake City 1, Utah, on or before June 10, 1950. A hearing will be held on this request for extension of time before the State Engineer, 403 State Capitol, Salt Lake City, Utah, at the hour of 10 a. m. Jiie 20, 1950. Protestants may appear at the hearing and adduce testimony in support of their protests. HAROLD 'A. LINKS State Engineer First Publication, April 27, 1950 Lest Publication, May 11, 1950 |