OCR Text |
Show Ileal firm receives million dollar litract on CUP feeder pipeline j million construction con-uild con-uild Docs Feeder Pipeline, V he Central Utah Project's Idle Unit located ap-ltely ap-ltely 40 miles northwest of W, Utah, has been awarded Bureau of Reclamation, 'y of the Interior Don Hodel ed recently. rn Utility Contractors, Inc. ant Grove, Utah, was low or the $1,527,014 contract. v,:The contract calls for the installation in-stallation of 3,450 feet of pipe; construction of a stream inlet; a flowmeter structure; a 2,500-foot-long, 18-foot-wide access road; and other associated features. The contract also calls for replacing topsoil and reseeding the area. The work will take two years to complete. com-plete. The Docs Feeder Pipeline, part of the Strawberry Aqueduct and Collection System, will supply 100 cubic feet per second of water to supplement flows from the Upper Stillwater Reservoir. The collection system intercepts and regulates the flows from 9 streams for storage in the enlarged Strawberry Reservoir. The water will be used for irrigatiaon, power generation and municipal and industrial purposes downstream from Strawberry Reservoir. |