OCR Text |
Show Mil i j Separate sealed BIDS for the construction of The Spiro Tunnel Water Transmission Line, including about 3.000 feet of 12 inch water line, 2.400 feet of 8 inch water line, a reinforced concrete vault for metering, and a reinforced concrete booster pump station with chlorinat-ion chlorinat-ion building will be received by Park City Municipal Corp. at the office of the Park City Director of Public Works. Marsac School Bldg., Park City. Utah, until 2 p.m. Daylight Savings Time September Sept-ember 22. 1981. and then at said office publicly opened and read aloud. The CONTRACT DOCUMENTS DOCU-MENTS may be examined at the following locations: Suh & Gudgeli. Inc. 555 South 300 East Salt Lake Citv. Utah 84111 Copies of the CONTRACT DOCUMENTS may be obtained ob-tained at the office of Bush & Gudgeli, Inc. located at 555 South 300 East, Salt Lake City 84111 upon payment of S40 for each set. Anv BIDDER, upon returning return-ing the CONTRACT DOCUMENTS DOCU-MENTS promptly and in good condition, will be ,-efunded his payment, and anv non-bidder upon so returning the CONTRACT DOCUMENTS will be refunded refun-ded $20. Published in the Park Record September 10 and 17. 1981. |