OCR Text |
Show BAMBERGER TO INSTALL FLYER The Bamberger line Is preparing to compete with the 45-mlnute Salt Iake-Ocden Iake-Ocden trains of Its rival the Short Line. It was announced this afternoon, after-noon, that, commencing Sunday next, tho company would re-arrange its schedule so as to give Its patrons three fast traln6 daily between Ogden and tho Capital, and promises to mako the run In less than an hour. The fast trains will be three of those on the present schedule, but the running time will be shortened so as to mako the trip in loss than an hour probably close to or at the 45-mlnute mark Fot by the Short Line. The new schedule will be announced announc-ed later. I |