OCR Text |
Show EUREKA PRODUCTION BAINS FOUR CARS EUREKA Nov. 4. A total of 14S cars of ore was shipped from the Tin-' tic district last week as compared with 142 cars the week preceding In addition to Its regular shipments of ore. Chief Consolidated Mining Company shipped during the weeK eight carloads of lime rock, eight carloads of road material and one carload car-load of quicklime. Mines and tho production of each lor tho week follow: Chief Consoli-dtaed, Consoli-dtaed, 61 carloads of ore, Tintlc standard. 37, Colorado Consolidated, 14, Drajron. 8; Eagle and Bine Belt, 8, Victoria. 8; Iron Blossom. 6; Gemini. 4. Centennial Eureka, 4, Empire Em-pire mines. 3; Tintlc Drain Tunnel, I 2; Bullion Beck, 2. Yankee, 1, total' 146 carloads. |