| Show LOGAN OPENS BIDS FOR POWER PLANT LOGAN July ids 27 27 7 Elda for fOJ the tho Installation and construction of hydraulic equipment pipe line and equipment aggregating for Logans Logan's new power plant ilant have been opened opened by the city commissioners commissioner City engineers and A J Wiley hydraulic engineer of Boise Bolie Ida have hae been busy for two days check check- checkIng checking ing Ins over the bids but as et they th e y base ha not completed their task so sono sono sono no bids bide have been lot lei For tho the pipe line the D C Dun Dun- Dunbar Dunbar Dun bar bar company of Salt Lake Laka I Is the lowest bidder with 1 Ith a 0 bid of 68 68 68 The B S Morgan Smith com corn company company pany bid against from the Worthington company for hydraulic equipment The West rest WestInghouse company made a bid loJ pro for the use of a Morgan Smith water wheel of while they make a bid of o with a Worthington wheel In all probability the contracts will be let by |