| Show AT DESERET WELL ON two carloads of drilling equipment for the deserea petroleum companas comp anys well on gibson dome have reached thompsons Thomp sons and will be moved to the location within a few days drilling will start just as soon as the materials can be moved in and assembled the deseret company moved a standard rig to its permit on gibson dome last summer the rig was erected and the hol studded in for validation purposes at that time and it is now intended to carry the hole on down L L travis and A J turner who are heavy stockholders in the deseret company will drill the hole A drilling crew is expected to arrive from florence colo within a week or two the deseret ng on gibson dama Is one of the heaviest in the local field and a new steam engine and boiler are already at the location the equipment which arrived this week consists of tools of all kinds and casing and moab garage company trucks will start moving it to the well i within a few days with the resumption of work at the deseret well three standard als will be drilling on gibson dome the utah petroleum is drilling at a depth of about 1250 feet and the empire gas fuel is getting its hole in shape for a resumption of drilling following follow ng an extended fishing job the hole has been plugged back to straighten the western states de companas comp anys standard rig has been closed down on account of financial difficulties a depth of feet having been made |