Show ZUMA TO INSTALL NEW COMPRESSOR At the Zum Zuma property In the eastern end of oC the TIntic district work will wi beI be bo r resumed within tho the next da day or 01 two after I a shutdown of ot ton ten slays days or more The Tho management will wi continue th the work ork on the BOO 60 0 level but Instead of keeping on with the main drift it I is I. thought advisable advis advia- able to follow olow some ore of the breaths breaks bres which were cut out farther back In this drift eN Officials of the Zuma state that In thenor the tho near nor future a I now new compressor will wi be bo Installed as aB th the one now flOW In use there Is Js not Ilot InO enough to take care cre of the work m an I tb tw the proper manner |