Show I a C CARDIFF VEIN FROM FROMa lOOT FOOT TO HANGING NALL MEASURES 8 62 61 2 FEE FEET T I i lit J At the thi Carom Cardiff mine they ney have hac drifted i to tho cast eul from tx-cm the tunnel level le and f found that the to width of or the ore 1 body t from tm the te foot rot to the to han IS wall wait wal 1 1 li lif 1 f two sixty ft feet t. t Thus Tor or tho tha tr first t time t p tn the tho ore was as In tho the contact the tha management iia Jit has o obtained j mo Ida of or the tho to dimensions lons O of the tho de deposit do- do posit on the lo lower er tunnel level This t i measurement I IB hI of ot the ore within about but j fc feRt t of ot the face of or tho the tunnel i and nd U It I I Is Ie t the p presumption that at nt this t great groat gent width R fair average of ot the values can Cnn be obtained Tho lead contents of ot the tie east drift from th hl tunnel l level are quit good tho re TC returns re I turns showing 46 16 6 per c cent nl I lead r an and aid twenty five ounces ounce silver sl er to the ton The better bete values ahles have o h bc been n found In this drift and In th the th pr present mt face taco of the tho tun tun- Jp nel reI Some Somo omo shipments have flave hown shown an nR much us as os 37 7 3 to th thA ton tOnS but tout this Is higher than the te average shipments that i h have 0 been tan mado sUzco the lie tle ore was fIrt encountered encounter d. d I r There There- Is being shipped 1 from this property property prop prop- erty rt about twenty tons tOM of ore arc a day ay President Ezra Izra zt Thompson fa nays aa s 's that tho the hauling bauling m may bo be discontinued at anYtime any anytime r time as na th the first big In the tho Cottonwoods Cot- Cot F will wl mako tho tha road Impassable f to the mine Tic He l Is Js not anxious to continue con con- nue ore ort shipment nt at pr prevailing market market market mar mar- ket prices and ann M says that no attempt to bring the ore to 1 the morl market et would mould h have 1 been n made after th the oro ore was va l that first encountered cn- cn countered a few le months ago except for tor torf f tho the that ed In Inq fact tact teams were cre 1 engaged 3 q hauling supplies to the tho mine for the win win- fer and It was 9 decided to give Ilvo them a aTtOn ij return load toad and aud the orn ora was brought i down from the we he mine to the tho Murray sam pam pier as ns R a H result reut J The raise from the lower to the upper 3 tunnel iu Is being continued This working Is out of ot the ore at nt this time as the raise rAie IB Is II perpendicular This raise was In Inthe Ih hut but the Is Js the ore are for tor some distance ore making oft off or Jo io tim tho side of th the ral e n end nd r no further r will tilI 1 be made to develop i Jt it J until th connection Is made with the i upper workings l. l Work rork In tho the face faco ot of i. i the tunnel tunnEl will wi soon oon be taken up ur again agin j. j During tho the winter vinter months month while whilo th I Is hi 11 shut In from the outside a con con- ji amount Joun of oC development dc t work wor will wl be bs bf done a an as the company has a good od i sized force rore 9 at et t th the mine an and all aU supplies I I. I have hwe been taken up to the property |