Show I ru ir-ru SILVER SHIELD SAVES 1 ORE OE FROM FRO SEVERAL SEVERi l PLACES iN MINE MIME Ore i Is 16 hell IC oil i n fio-n rom I In itt Silver I er Shield Shu 0 at u 1 Bin h 1111 1 tho the mal management static Hall ti itil 11 till in al arrangement ar arrangement sir sir- lust hint U for a i completed supply of or INI stir all should sho 1 enable the company to lo Increase I its output rapidly Tho da deal al for air was snack made malC with the thc United States Smelting Refining and 1 lust n ic company whose Niagara tunnel I ix In 1 is-in is s d b b. by the Shield in pl gaining ng access to ci 10 lower loner workings working A power drill dri will wi 1 I in sl ted at once In the west wesl drift drifton on the thc H Highland vein at t the tunnel 01 level and anti tilt the drift extend extended to a known fissure ab about ul fifty feet distant The connection should be he e made In il ton ten ten days dayn and the tho management i is hopeful of or ore oro and In less than that thai time Ore is let being saved from two shoots in let the one making in inthe Inthe inthe the fissure and the other In a bed bod- ding Each shoot Is said to be from one to two feet tet wide They are ae dipping clipping dip clip ping the tunnel level arid a adrift adrift I from lae tunnel to driven drift Is belog thorn them The first should be Intercept cut in t tn ten tm noel nd the second In In twenty feet teet About sixty tons o of first class cas I Ore was was was' saved sved from coin the Miracle in September Further back in hi the he lessees lessee have Futher 1 bp Is known as the Greek tec raise r thirty five Y feet In an Inch eighteen Gel is vein carrying si six inches In hes of ore ore- oreA reA r re- re A drift hs has been bean started south on the vein from rom th the top of the raise ad and te the ore ore-iq ore I I being saved aved sved At the present price of lead leati the ore orein oreIn orein in the back vein can ca be lie shipped at at a profit prot In bac n n Order to to get Ret at the big stoP I pipe olpe and fan of low grade a. c J fr n nb Save have been installed and e extraction c will b f begin begin- at once Arrangements are being made to sink an air shaft shaf from om the to toa a connection with this vein The Beals lease Jease on th the surface workIngs work work- Ings lags of the Shield is sl said to o b be 10 looking I even better etter b thau tl iap a week wee ago when the the theore ore In i the te nat tope slope was twenty feet wide and twenty feet long and going up Although Albough ind the mass as broken is I of medium grade rae It Is is filled fied with streaks ks o of high grade lle galena galen which can st be S sav gaved by Sorting Sorting- g A car of ot first class and ana a. a a coy cay of second nd class cass were se shipped lat last mont month and there are filly fifty tny tons nore In iii the binIn binIn bin In Jore the Snowstorm I tunnel seventy seventy- sevet- sevet five feet below this ore body bod a is Js b being conk on oh eighteen inches of v ery tery j very I rich itch silver lead oce ore The intention is to torun torun I lead siver Tte run a level from the at fifty f feet et and ld stop up to the tunnel leel level I The The- Theore ore streak shows in the floor 1001 of or the 6 n e for 3 0 feet ee I 1 |