| Show UTAH COPPER IS GOOD PROGRESS IN CONSTRUCTION I Be Before l leaving vrn for Bute Butte Bulto yesterday Y I Col Co D. D D. D C. C C made the statement tha that t he had coh his inspection of r I the Utah Copper Coppermine mine and mis mills T That at athe he wast was vas well pleased with the progress that had wel b been n made In itt construction work anti and that instructions had ha been given t to rush all the te work to the finish with as little Ute ill delay as Cs al possible He lie said that there would be b no material change In iq the out output t from Utah Copper this year e as s the enlargement of t the mill plans could I not be lar finished f at for cOrt cOr several v h months There will wl be however less in m- m in- in of the output froin fo the mill milI this winter that thai thaI ever before and ad In Inano her year these plants will vili wi be so ar arranged r- r ano ranged that the cold col snaps and heavy snow falls fals wi will wIli not Interfere with operations opera opera- in the l least ast tons l tine Mine work will wi doubtless e some handicap from flom the te winter weather weal but every precaution has been tal taken en to Itt minimize minimiSe the obstructions of ot the railroad and pits pis by heavy snow falls fatis fals that are are blown Into Inlo almost insurmountable drifts As AI nearly as possible the mine and anti mills nilis wit will be ha be made to equalize production during dUI due ing log wi the winter and summer months I When all the new new installation has been made the Ians lans provide for foi- fol raising the th output about one third This Tilts that Utah Copper will wi eventually output as as' as much as pounds of copper a. a t month which will wi Increase its production yearly yearl more lnore than pounds of copper opper With a corresponding increase in profits Utah Uth Copper will wl not only in itt the to world W be the but largest tr its ft earnings e copper Y s sP P producer will be befar befar far greater than any w western stern industry The leaching plant will wi be commissioned first and the company has enough of the oxidize material nat to be tr treated by bv this process for a nu number er of years The al alterations alterations alterations al- al in the mill mil plants are rapi rapidly shaping into form foron and the operations will willbe wl beon be on a much larger scale from the concentrating con con- con process while the leaching will willbe willbe wi be ate air aI entirely new feature |