OCR Text |
Show 4V W. 2,665 ft frn Sec. 5, T. 6 S., r 2 H 15627: 30 sec. n' . ous industrial uses at Steel Plant from Can tributary to UUh La? N. 2,515 ft. and W 1'; E.14 Cor. Sec. 6 T B 1 6ft ! The water will be R a 15-in. pipe ,Wft, 7,240 ft., where it J!Sfe-charged J!Sfe-charged into No. 3 dr,T 1 and conveyed through a,?"1 a further distance tf7: concrete-water tunnel ft' through the water tte S: tance of 2,105 ft. to aT where the water win h throughout the plant site1" consumptive uses J? been so used, the water l"? turned to Utah Lake '! 69 deg. 4r W. 2,665 ft J" Cor. Sec. 5, T. 6 S. R 2 5 15661: 0.3 sec. ft',' purposes from an 8 to i bet. 200 and 4nn ff , m'"' - S. 1,780.34 ft. andW W from NE Cor. Sec. 27 t, R. 1 E. The water will L',' from the well mt0 storage tank from whence be pumped through a 4 " line a distance of 189th"! : 16,000-gal. tank from water will be distributed';; Payson Quarry Mine, wh be used for cooling M ''' drilling, and other iricident'-' at the above mine 15682: 10 sec. ft. for neous-industrial purposes"' Fugal Springs Channel tr to Utah Lake at a point X : ft. from SW Cor. Sec. 4, V; R. 2 E. The water will b! veyed in a ditch 1,300 ft a-,;. charged into an open fcj,': commingled with other rsv longing to the applicant ari veyed a distance of 2.600 ft 24-in. pipe line from wherr-will wherr-will be conveyed a further of 3,600 ft. to a concrete tunnel, thence through the r tunnel a distance of 2,105 ft ' power house, where the wj;a-be wj;a-be pumped through a pij bution system and used for consumptive-industrial m'i NOTICE TO WATER USERS The following applications have been filed by the Defense Plant Corporation, Dooly Building, Salt Lake City, Ut. with the State Engineer En-gineer to appropriate water in Utah County, State of Utah, throughout the entire year, all locations lo-cations being from SLB & M: 15626: 10 sec. ft. for miscellaneous miscella-neous industrial uses at the Geneva Gene-va Steel Plant from Lake Bottom Canal Wasteway, tributary to Utah Lake at a point N. 20 ft. and E. 753 ft. from SW Cor. Sec. 8, T. 6 S., R. 2 E. The water will be pumped through a 12-in. pipe line a distance of 1,900 ft. where it will be discharged into an open drain ditch, and conveyed a distance dis-tance of 2,500 ft. to a concrete-water concrete-water tunnel, thence through the tunnel a distance of 2,105 ft. to a power house where the water will be pumped throughout the plant site for nonconsumptive-indus-trial uses. After having been so used the water will be returned to Utah Lake at a point S. 69 deg. having been so used the r will be returned to Utah U a point S. 69 deg. 41' W. 2.K from Wi Cor. Sec. 5 T ; R. 2 E. Protests resisting the prof pr-of any of the foregoing r.:. tions, with reasons" therefor'; be in affidavit form, witi copy and filed with the State L gineer, 403 State Capitol L Lake City 1, Utah, with a :'r $1 on or before June 17, IKi ED. H. WATSC STATE ENGDC Publication dates: April', and May 4, 11, and 18. |