OCR Text |
Show CHIEF CON. SHOWING HIGHLY FAVORABLE ; The report of the Chief Consolidated Mining company, Tlntic district, Utah, shows that there were total shipments of 42.144 tons of ore yielding, after the payment pay-ment of transportation, smelt ing and sempllng charges, ?742,0.VS, savs the Engineering Engi-neering and Mining Journal. Average ross value per ton was $30.0S, while the cost of smelting, freight, sampling, etc., amounted amount-ed to J13.47, leaving a net a vera ye value per ton of 517. til. Total operating costs for six months amounted to $276, 2th!. The cost for machinery and equipment was $14,996; for construction. $S."20. and other expenses and dividends bring the total up to $f33,)S6. Total receipt? amounted to 191 f. 2 76, leaving a net balance on Julv 1, 131fi, Of |