OCR Text |
Show CLIFF MINE DOING DEVELOPMENT WORK Grant Snyder has returned from a fw days at Alta looking after the Cliff Mining Min-ing company's lease on the upper part of lite Mnhigan-L'tah territory. About luenty-five tons a. day Is beins t-hipped a t present, the output being somewhat affected by the fact that thin is the wet period in the mine, as ts always the cacH for a short time about this time of tiio yea r. Krom the Cliff mine at Ophir, Manager Snyder frays, about the usual shipments are bHng made and some development work is being done. A drift is being run south on the 10"fi level of t he Tony incline, in-cline, with the object of tapping the new vein in t ha t territory. Superintendent A. H. Williams reports tlio face of the drift showing pome mineralization and looking better than, at any time recently. |