| Show ORDERING A COMPRESSOR Manager of 01 Odin Property Comes for That Purpose Henry Welsh the Park City busIness busInessman man and manager of the Odin Mining properties is down from the Park figuring with machinery houses fora for a compressor plant with which It is proposed to equip the mines just as soon as it is possible to haul heavy material to the mine mineI I would rather not say anything about the compressor said Mr lIr Welsh until we have had It installed It is isone isone one thIng to talk about doIng such a athing athing thing at thIs time of the year and an another another other to do It We must have power drills however and the mine will be equipped just as soon as we can get a plant on to the ground Mr Welsh stated that the property was opening up well but he did not want the impression to get out that all the ore encountered was of such hIgh grade character as had frequently been reported n It was true he said sald that lots of ore did make but the mass of it would be classed as milling ore Just before leaving camp he was advised by C H Gitsch the mine fore foreman foreman man t that at carbonate ores were being encountered in the raise that was recently started to prospect the ledge above the tunnel level and It looked as though a big shoot of It would be developed Manager Welsh considers that enough work has now been done on the property to demon demonstrate demonstrate strate that it will make a mine of no mean magnitude and the purpose of equipping the property with g a corn com compressor plant is that the ore bodies may be all the faster opened up He will return to camp tomorrow |