OCR Text |
Show How Engine For municipal I I Power Plant AniuJ i Unit Unloaded Tuesday Onto Foundation. Foun-dation. Materials For Lines Also Arrives. The new ISO horsepower diesel engine en-gine with the attached 150 K. W. generator and independent exciter arrived Monday over the Orem line and was immediately unloadoil and set on the prepared foundation along side of the present 80 horsepower unit. Cross arms and other line material are also on the groun'd and enroute and the construction on the new unit will be pushed as rapidly as possible. E. B. Jones has the -work in charge and now that the materials are here he reports that he will lose no time in getting the lines up and the new unit into operation. It is expected that service -will be rendered some people within thirty days an'd the lines should all be up and rendering service within sixty days. There are now two lines up, one running to the Memorial building and another north up Center street to the Second ward church. As has heen announced several times before the Fairbanks-Morse company are furnishing all equipment equip-ment and machinery for this new unit and accepts pay for it from the net 'profits of the system. It is expected ex-pected that the plant will "pay out" under this plan in from five to six years. Lehi Sun, Lehi, Utah. |