| OCR Text |
Show REVISED PLANS FDR NEW JUIIDR HIGH TO BE OFFERED A change in the plans for the construction con-struction of the new Central junior high school building is now contem plated and a set of revised plans will be submitted to the school board to-nisbt to-nisbt which have been drawn so as to permit the utilization of the old structure until the treasury is better prepared to provide for the construction construc-tion of. the new building according to first plans The plans for the new building have been drawn by Architect Eber F Piers according to the ideas of Superintendent Superintend-ent H. C. Johnson. These new plans will be discussed tonight by both the sehool board and the clearing house assni'ln t ion PresiH-nt T rvr-rlolil nf the board called a special meeting for tonight to take up the matter. The original plans called for an expenditure ex-penditure of $350,000, while the new plans will not require an expenditure at the present time of more than $275,-000. $275,-000. This is considered a figure that will take care of present needs and .it the same time allow for the building (of the South Washington building, for which the people voted at the election In April. oo |