OCR Text |
Show uu CONSTRUCTION DELAYED BY WEATHER Due to the frozen condition of the ground in Ogden canyon construction I work on ilie Huntsvllle extension of the Rapid Transit ititerurban line has been temporarily suspended Engineer Joseph 'c-sr stated this I morning that the work would necessarily neces-sarily have to be do:;c at sreat dis advantage at thi time and that H v.as necessHry to cease operations until weather conditions improve Much of the culvert work and p.r.. i ing at points where high water will reach the roadbed has been done, bir there is yet considerable distance aiong the river where high water will materiall interfere. However, th. voi k will be prosecuted r,s rapidly as possible with tho hone that the road can be completed and mrf operati 1 over it earlx this season 'ontractor Henry st has not yet returned from California but he is expected home in the course ot a lew days at which time he will resume operations. |