OCR Text |
Show New Lincoln School center to be $100,000 business Purchases at the IMC for supplies, materials and repairs re-pairs ordered through the Center will total $100,000 Mr. Argyle stated. With district dis-trict supplies handled through the Center on a volume basis, considerable savings can be effected. Already Al-ready a preliminary bid will save the district $25,000 he pointed out. Between 209 and 25 savings can be realized rea-lized through volume purchases pur-chases on a direct mill shipment ship-ment basis. Principals in the respective schools will need only to make up supply orders or-ders for their immediate L ! : needs and alleviate storage space previously used for storing a year's supply. The IMC will handle the district's dis-trict's entire supply needs of educational materials, furniture furni-ture including sewing machines ma-chines etc., and all repair items other than mainten-tenance. mainten-tenance. Maintenance items come under the jurisdiction of the Payson maintenance office administrators. The IMC is a veritable storage center for collecting, ordering, purchasing and distributing dis-tributing materials and repairing re-pairing them, and used by the educators to enrich the students' day in the classroom class-room and to make education easier to gain, and more effectively ef-fectively to retain, it was pointed out. Part of the administrative operation of Nebo School District will be shifted to Springville with the opening of the Instructional Materials Mater-ials Center and IMC warehouse ware-house in the Lincoln School building and former shop building east of the old high schcol. It is planned to have the IMC at the Lincoln School ready for use for the simmer session. |