OCR Text |
Show DIXIE TOWER CO. GETS LINE IU II. DING PERMIT Authority was given the Dixie Power company by the public utilities commission com-mission Saturday to build n 24-mile ' transmission line from Leeds In Wash- ington county into Zion National park. The new line Is designed to serve the Nevada Construction company in the building of the Zion-Mt. Carmel road which will require considerable tunnel work in which electric current will be used for power. The new transmission line Is also designed to serve the villages of Virgin, Vir-gin, Rockvlllc and Springdale which are not now adequately served Willi electric power. The new transmis- sion line is to carry 33.000 volts. |