OCR Text |
Show MAIN ST. SHOULD BE GRAVELED While work on the sewer and drainage drain-age system is under way we expect Main street to be in anything but good shape. But once this work is completed complet-ed our City Fathers should make a strong effort to gravel the street or, if that can not be done, to at least put a good surface capping on it. Before work on the sewer was started Main street was in poor shape and we hope it will not be left in the same condition condi-tion when sewer work is completed. |