OCR Text |
Show fridge near Tucker tobe replaced I, lluh Department of .porUtion will soon re-1 re-1 m old ',Stvr slKlt" on iSpinishFork Canyo?; Hioifw"sn&ITOW old bridge that bottle-ktrtffkeastof bottle-ktrtffkeastof the Tuck-Are. Tuck-Are. It will be Yjgti by 52foot wide vj steel txm structure that Jeirry two traffic lanes V:tf uphill truck lane over IvDiRCW railroad tracks. 1 ; 'jjjs tor the contract were ?; today and drew an JtlowbidofJ1.2S6.627 4 LA. Young Sons Con-P.vtiM Con-P.vtiM Company of Rich-jiUDOT Rich-jiUDOT engineers esti-'s'pi esti-'s'pi the cost of the project -yjew bridge will be built pi of the old one on a new '-jwnL The contract also (ijjes provisions for l'A j of pived approaches to putmlly connect it with the existing highway. The project is allowed 120 working days for completion. The contractor contract-or is expected to begin work on the structure this fall, with little traffic interference expected ex-pected during the initial phases of the project. Traffic will continue to use the exist-, ing bridge until the new one is completed sometime next summer. |