Show I FROZEN PIPES ARE FAST THAWED OUT One of ot the time crews employed by the city wat waterworks department for tor the tho past month In thawing out frozen services services ser Her vices leeR was yas relieved today and C. C F. F r. r Barrett Darrett superintendent of or the wat waterworks waterworks water water- r- r works department stated staled that the lilt sit sit- IN is considerably improved ed with the vest wot side Ide entirely clear of frozen pipes and nearly all those on the east eastside eastside I I side thawed out Since the tho beginning of oC the cold weather tho department has I th thawed wl 63 service er connections This does docs not include those attended to by byI I plumbing firms |