OCR Text |
Show NEVADA HILLS MILL , WILL START ON ORE IN ABOUT ONE WEEK President George Wlngflald baa juat issued is-sued a statement regarding conditions at the Nevada Hills properties In Fall-view, lie says thst the mill construction work Is well In 'hand and that the officers expect to begin operating by the middle of August. Au-gust. Ihey will limber the plant up by running through tbe lower grade ores and after It has been regularly commissioned It will be operated on the average output from the mine. The mill structure la of concrete and ateel throughout, and la described de-scribed as one of the moat modemly equipped reduction works In all Nevada. Patterned after tha Ooldfleld Consolidated mill. It will have still more modern appliances appli-ances Installed, which will glvs It a number num-ber of ad ventage.. The capacity will be 164 tone dally, and when It la considered that a very high grade concentrate will be produced. It can be aeen that money will be made very rapidly for gharehoklera from theee operations. B. A. Julian, who waa eupertntandent of the Combination mill and later aaalstant superintendent of the Consolidated minee at Ooldfleld. will have charge of mill operations ope-rations at the Nevada Hills. A considerable consider-able amount of ore la now broken down In the stopea, anl ready to keep trie mill supplied. Is eJdlllon le -this a good lao. nage of ore haa been raised to the surface sur-face aad placed In the bins at the mill. I The mine development haa been moat satisfactory, according to Wlngflelds statement. The ledge for which they were driving In Ihe old worklnge of the Nevada Hills has been tapped on the (70-foot level, but not enough work haa been done to determine the extent of this find. This strike is considered Important, aa It la the continuation of the richer ore body for I which the management has been driving for several montha Ore Is making Its appearance OR several of the levele where development Is being carried on. and some liberal depoelta have been exposed. |