OCR Text |
Show WILL CONNECT WITH THE ALL'S WELL LEDGE. It has been determined by the management man-agement of the Utah Copper company to begin sinking and driving at once to connect with the All's Well ledge. The shaft will be put down on the east side of the canyon. To cut the ledge from this shaft it will be necessary to drift 750 feet and the ledge will be tapped at a depth of 500 feet. In the meantime a drift will be driven from the main shaft to connect the new shaft, which will then be used for ventilation purposes. The Ohio Copper company has followed the All's Well ledge up to the Utah end line. Messrs. Penrose and MacNeiU have returned to Colorado. |