OCR Text |
Show Plata Are Completed. Chief Engineer Vail of the Salt Lake and Ogden Railroad company was in the city yesterday, and exhibited a number num-ber of plat of the proposed Improvements designed by Simon Bamberger, lor the Oaks and nearby property recently acquired ac-quired by the Ogden Canyon Resort company. com-pany. A "Trail" has been laid out from the bed of the river to the summit on the south side of the canyon. This will be carried up to a point where people on horseback can have a view of the entire surrounding country, and will be over two miles in length, though rising only about 1000 feet. The trip up the "Trail" will be one of the most attractive that sightseers could wish. There is a fine spring at the summit, and at this a rest-house rest-house will be erected, while from that point various trips can be taken. |