Show WHITE COLLAR COLLARI WORK LINED UP I City Sets Up I Worth of Projects F FER E R A projects estimated to tc cost had been set up Wednesday Wed Ved by city commissioners commission rs for faa benefit of f white collar professional proCessional profession proCession al and workers The schedule was announced by City Engineer Engine r W. W D. D Beers in response re response re- re to a communication from W W. T. T Igleheart coordinator for th the state E ERA R A. A The state committee must pass upon all of the projects before they become a reality and workers hired Included in in the list were the fol lowing A smoke elimination survey 31 31 1 e compiling records of ot city city- owned property survey of ol F FERA FERA Fl ERA H A projects 11 establishment establish establish- mont ment of or monuments and makin making control survey along Wasatch fault tault investigation of precipitation tion lion records by studying annular rings in trees on Salt Lake City's I watersheds Commissioners instructed the engineering en- en department to proceed I with pl plans ns for all aU of the projects to tc tobe tobe be to the state E ERA R A. A |